Mr. Ken Ramold * Mr. Mike Montag *Mr. Robert Zaruba *Mr. Greg Swinarski *Mr. Larry Weigum *Mr. Dan Zak *Mr. Jeff Norris *Mr. Leonard Gabriel **Director of Center: Teresa Monaghen * Leela Sebastian * Anne Zugelder
April - May 2010
TO DO * WHEN
1. Burn Pile - Join us on May 1, 2010 9:00 am - all day
2. Several doors in the house need attention: Don't close, bent, etc.
3. Dig thistles on property
4. Mowing!!! Any time, any day, it is growing!
5. Refinish floor in big room and paint before camp
6. Plumbing issues in cabin - Ken will make list
7. Roof of barn still has leaks
8. Gutters still leaking
9. Oven in barn needs looking at
10. Painting railings, deck, and around windows of house - much weathering has happened and the bare wood is showing.
11. Trees mulched and Angel woods cleaned up and mulched.
12. Other?
Camp/Center Clean up day is May 29th - coordinated by Camp Fun and Faith Staff - All are welcome!
June 6 is Open House for Camp - touch up and clean up on June 5th (this is Camp training day, but if you are not involved in camp, come out and spiff up the camp for the 6th).
Sunday, April 25, 2010
Subscribe to:
Post Comments (Atom)
2 comments:
I forgot to add to the list that we need to put a vent, a passage for air, in the kitchen stall, last one on the left before you turn. If we have a vent, then we can just have a fan going during the summer to keep it ventelated and clean.
The bathroom on the east side of cabin has a leak underneath the first sink (I believe the hot water line). I think there is a kink in the coupling on the pipe. Also, the push button on water fountain sticks and the replacement fountain head doesn't fit ( the wrong one). I've tried myself to fix them, but with no success. Extra assistance is needed for whoever has the time.
-from Ken
Post a Comment