To Do List – January 21, 2012
Come out to the Pro Sanctity Center and help!! See the new building in the last stages and have a cup of hot chocolate!
1- Pick up the retaining wall blocks from front lawn and place on pallet by New Shop.
2- Move iron gate from lawn to area behind school bus.
3- Move lumber from rafters inside small red shed to lumber rack inside New Shop.
4- Pick up non rock trash from crushed rock driveway and put in dumpster.
5- Pick up screws, nails and other metal with large magnet all around New Barn and New Shop and put in dumpster.
6- Cut up firewood and pile neatly behind bus. Place small brush in burn pile area. Persons doing this must have the approval of Bob Zaruba before using chain saw.
7- Organize excess wood and metal materials behind bus.
8- Clean up meeting room in cabin.
9 – Remove remnants of black silt fence north of Angel Woods and put in dumpster.
10- Rehang gutter on north side of house.
11- Excavate area of new retaining wall to four (4) feet back of the parking lot curb.
12 – Sweep floor of New Shop.
13 – Repair silt fence along north property line.
14- Pick up dead limbs from Angel Woods and place in burn pile.
15 – Pick up debris from entire property north of creek and place in dumpster.
16 – Water new trees around cabin if air is above freezing and ground is not frozen.