11002 North 204th Street, Elkhorn, Nebraska 68022 * 402-289-2670 * psm@prosanctity.org

11002 North 204th Street, Elkhorn, Nebraska 68022 * 402-289-2670 * psm@prosanctity.org
Pro Sanctity Logo by Sculptor, Mike Montag, Green Team Member

Sunday, October 30, 2011

Green Team Progress

Leonard Gabriel led the team in getting new siding installed on west side of the house. Looks really nice.

Bob Zaruba will have a team on site Wednesday Nov. 2nd to complete some work on The Shop. Additional help is always welcome. New tools are accumulating in The Shop. A 3 Ring binder will be placed in The Shop to hold all of the new owners manuals.

Wish List: 1-Peg board (2' x 8' or 4' x 8') to hold tools and supplies; 2-Plain hand saw (20 teeth to the inch); 3-Lots of peg board brackets; 4-tool brackets to hold shovels, rakes, weed trimmers on the wall.; 5-shelving for tools and supplies.

Regards
Bob Zaruba

Friday, October 14, 2011

Join us!

The Blue Team meeting will be on Friday, October 21st for a Pot Luck Lunch meeting 12:00 noon at the Pro Sanctity Retreat Center!

We are gathering cost quotes and planning notes for the North Hill outside the New Barn preparation and we need info of who wants to donate time, labor, plants, ect. for the hill, also a time line needs to be put together.

In addition, we also will plan a Camp Alumni Mother/ Daughter Spring Day of Prayer and Little Flowers for Our Lady…or something like that!

Our Lady’ Garden Hill and Camp Alumni Retreat will grow very well together!

Teresa and Team

PS Come out to paint New Barn Rooms! Yes, we are at the painting stage today! Join us today, October 14, 2011 or tomorrow! Come anytime!

Wednesday, October 5, 2011

Green Team meets again! October lst

Results of October 1, 2011 Green Team Meeting

1-Teresa has been advised of a web site used as clearing house to find homes for church items such as pews, altars etc.  She will look into it to see if any of our needs for Barn and Chapel can be met here.

2-Leonard Gabriel can provide free interior paint for use by our volunteers to paint offices and multiuse rooms.

3-The Wells family has offered to provide concrete floor sealant at no cost.  Bob/Teresa will ask Chuck Lacey if it is acceptable product and if he willing to use it in the Barn.

4-Bob/Teresa will ask Chuck Lacey if he plans to install a dryer vent in Barn laundry room.

5-The sloped area north of Barn between Barn and Angel Woods will be sown with native grasses, flowers and/or wildflowers.  Teresa will get estimate from vendor to kill off existing grass on the slope.

6-Consider installing small stained glass artwork in some interior walls in the future.  For example, if we name a conference room after St. Joseph, we may want to build a niche in conference room wall, install stained glass and have back lighting.

7-Consider having simple Stations of the Cross placed on walls of east part of Main Room for use when inclement weather prevents use of outdoor stations. (Eagle Scout?)

8-Storage room next to conference rooms is called The Stall.  This room has high ceiling which would allow for installing overhead shelving on East and West walls.  Consider a future project of single shelf about 4 foot wide and 7 feet above floor for storing light weight materials.  (Eagle Scout?)

9-Altar and Ambo for Chapel will most likely come from St. Anns (24th and Poppleton, Omaha).   It will be delivered before floor is in place in Chapel.  Bob/Teresa will find out if we should place altar on concrete floor and place tile around it or install floor tile and set altar on tile.  i.e. will tile support weight of altar?   Consider storing altar in The Stall until needed.  Also keep altar on wheels while stored here.

10-Kitchen will have electrical outlets dropped down from ceiling onto each of the two work tables.  Tables will be fixed to the floor, so outlets should be attached to the tables.

11-If any of the Barn utilities include propane we need to decide where to bury the propane tank.  Also should we buy systems that are easily adapted to natural gas in the future?

12-Existing septic system may be due for pumping.  Teresa will schedule pumping and also measure tank volume.

13-Large cross made from utiity poles needs to be set up.  Need to determine appropriate location. (Eagle Scout?)

14-Green Team should plan on finishing siding on house on October 22, 2011.

15-Green Team needs to develop plans for benches, shelving, tools for The Shop.  (Eagle Scout?)

16-Teresa/Jessi will order overhead garage door for The Shop.

17-Ask Chuck Lacey  to install two more electrical outlets in womens restroom in Barn.